Church Dropped Ceiling – Job in Progress in SW Detroit.
All Skill Construction, LLC donated time on day 1. We measured ceiling and created material list.
Hard wood floors were not in bad condition. Light sand with a 120 grit sand paper & a buffing machine.pass over surface enough times just to scuff the surface.All areas of floor must be completely free from trash and dust before adding clear polyurethane.
First step: Tear out all subway tile wire mesh and take out tub. We were able to carry the tub out but most times you have to break it apart with a sledge hammer. Step 3: Install 5/8 plywood on floor, install shower liner with 2 inch p trap and drain.Install single handle deverter with half inch cooper pipping. Install concrete board tape seams and seal with thinset.Pour concrete for floor and pitch toward drain.Get inspection by city. Inspection passed.Tile with 12×12 floor tile for floor and 3×6 subway tile and corner cap pieces on wall.Grout and install shower cover,and spout. Paint bathroom.Get final inspection.
Load all shingles and materials on top of roof.Spread tarps on ground to catch debris & protect shrubs,grass and flowers. Tear off all old shingles,90lb valley,flashing and underlayment.Repair all rotten wood. Get open roof inspection from city.
Objective: Remove aluminum siding and install vinyl dutch lap siding. Remove gutters & all aluminum trim around fascia and windows.”BEFORE & AFTER PICTURES”
custom siding with a brick pattern,vinyl windows trimmed in white aluminum trim.